Image from Google Jackets

OPTIMIZING DEVELOPMENT COSTS BY APPLYING A MONOBORE WELL DESIGN SPE 69498

By: Contributor(s): Language: Inglés Series: García, Rodolfo ; Publication details: Dallas, Texas Society of Petroleum Engineers 2001Online resources: Summary: The An Aike–Barda Las Vegas field, located in the Austral basin 80 km west of Rio Gallegos, Argentina, represents an important discovery in basin development in recent years. The field is an important Springhill formation gas reservoir at an approximate depth of 3100 m and with static pressure of 4400 psi. Gas rates are up to 1 MM m 3 /d/well. Drilling appraisal and development wells requires the optimization of every operation involved. In this context, improvements in well construction and completion methodology are important contributions. Original well design included 13 3 /8-in. surface and 9 5 /8-in. and 7-in. casings, with a permanent packer and 4 1 /2-in. tubing. The new monobore well design reduces the diameter of each drilled section, narrowing to a 4 1 /2-in. monobore installation through the pay zone. The rigless completion includes coiled tubing. Before adopting the design change, potential risk analyses were made to account for the possibility of future reentries and for simultaneous development of a second target (Magallanes formation) at 1700 m. The final well design model showed a cost savings of 30 percent, a sizeable impact on the economics of this project.
Item type: Congresos (trabajos presentados)
Holdings
Current library Status Barcode
Biblioteca virtual Not for loan 200003061

The An Aike–Barda Las Vegas field, located in the Austral basin 80 km west of Rio Gallegos, Argentina, represents an important discovery in basin development in recent years. The field is an important Springhill formation gas reservoir at an approximate depth of 3100 m and with static pressure of 4400 psi. Gas rates are up to 1 MM m 3 /d/well. Drilling appraisal and development wells requires the optimization of every operation involved. In this context, improvements in well construction and completion methodology are important contributions. Original well design included 13 3 /8-in. surface and 9 5 /8-in. and 7-in. casings, with a permanent packer and 4 1 /2-in. tubing. The new monobore well design reduces the diameter of each drilled section, narrowing to a 4 1 /2-in. monobore installation through the pay zone. The rigless completion includes coiled tubing. Before adopting the design change, potential risk analyses were made to account for the possibility of future reentries and for simultaneous development of a second target (Magallanes formation) at 1700 m. The final well design model showed a cost savings of 30 percent, a sizeable impact on the economics of this project.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales